Building Update

Work on the building has been picking up steam after a few weeks of downtime while some redesign was done and new steel was assembled for our roof.  We are hopeful that work will continue without a break until the building is complete, which is still expected to be by the end of August (it’ll take another several weeks after that to open the store).
Thanks to the efforts and creativity of our amazing design and construction team, so far we have been able to keep the net additional costs under control.  The sprinkler requirement and the additional roof work has had the following impact on our project:
  • safer, more unified and more attractive roof/ceiling
  • full use of available basement space
  • better fire safety
  • redesigned member corner, which can be seen in our updated design: